XÕ¾¸£ÀûËù

Search

Building Permit Forms

Home » Services » Forms & Permits »Ìý

Building Permit Forms

Common Questions:

Ìý
Q.Ìý Do I need to apply for a building permit with Linn County or the XÕ¾¸£ÀûËù of Mount Vernon?
  • A Linn County building permit should be obtained for all projects involving:
      • New constructionÌý
      • Expansion, remodel and/or replacement of existing structures
      • Electrical
      • Mechanical
      • Plumbing

Ìý

Permits are available online at:Ìý Ìý Ìý Ìý

or your can apply in person at:Ìý Ìý Ìý 935 2nd St. SW, ÌýCedar Rapids, IA 52404

  • A XÕ¾¸£ÀûËù of Mount Vernon building permit should be obtained for the following projects:
      • Detached garages and other one-story accessory structures (sheds, playhouses and similar uses)Ìý under 120 sq ft.
      • Retaining walls under 6 ft, measured from the bottom of the footing to the top of the wall – unless supporting a surcharge.
      • Sidewalks & driveways
      • Fences
      • Window, Door & Awning replacement with no change to structural framing
      • Concrete patios
      • Signs without electrical or masonry workÌýÌý
For further guidance on which application to complete, contact us at (319) 895-8742 x114.

NOTE:Ìý Exemption from permit requirements does not grant authorization for work to be done in any manner that violates building and zoning codes, laws or ordinances of the XÕ¾¸£ÀûËù of Mount Vernon, Linn County or the State of Iowa.

Q. Why does my project require additional review by a board or commission?

(Note: the following does not represent an exhaustive list of situations which may require additional review by boards and commissions.)

  • Historic Properties: Properties within a historic district must obtain a Certificate of Appropriateness (COA) from the Mount Vernon Historic Preservation Commission.Ìý Applications are available at XÕ¾¸£ÀûËù Hall or digitally via email from: lbradbury@cityofmtvernon-ia.gov. Ìý Commission meetings are held the first Saturday of each month and one Wednesday mid-month at the Mount Vernon Visitors Center.
  • Conditional Use Permit: A Conditional Use Permit (CUP) is required for certain uses, as outlined for each zoning district in XÕ¾¸£ÀûËù Code CH165 (ex. Alternative Energy Production – Solar). Applications must be approved by the Board of Adjustment, which meets on an as-needed basis. Applications for a CUP are available at XÕ¾¸£ÀûËù Hall or via email from: lbradbury@cityofmtvernon-ia.gov.
If you prefer, you can manually print and fill out the form. Return your completed form to the Mount Vernon - Lisbon Police Department.